Priority placement tool questions

#1349

KVLT
Staff member
I ♥ pointSixtyFive
Messages
317
Question relating to "Projected Losses": Is it in reference to losses in a given time frame? Such as, the expected loss of CPC's in the given year or in years down the line?
 

MJ

Administrator
Staff member
Messages
2,557
Question relating to "Projected Losses": Is it in reference to losses in a given time frame? Such as, the expected loss of CPC's in the given year or in years down the line?
For the training cycle. All of the projection numbers are relative to the training time (1, 2,or 3 yrs).
 

SugarFoot1

Trusted Contributor
Messages
444
What does the second to last column on the PPT actually mean? I feel kinda dumb trying to understand one or two things on there. If my facility says -3.5 for projected cpc in regard to the national avg, does that mean we are projected to be 3.5 controllers over the national average? What is all the colors people have been talking about also?
 

MJ

Administrator
Staff member
Messages
2,557
What does the second to last column on the PPT actually mean? I feel kinda dumb trying to understand one or two things on there. If my facility says -3.5 for projected cpc in regard to the national avg, does that mean we are projected to be 3.5 controllers over the national average? What is all the colors people have been talking about also?
yes. red is < 5% below avg, yellow >5% above avg, green is between the two.
 
Top