pointSixtyFive

3-1-5

Vehicles/Equipment/Personnel Near/on Runways

JO 7110.65BB, Change 3, effective July 9, 2026 · Official text on faa.gov

  1. When established in a letter of agreement (LOA), vehicles, equipment, and personnel in two-way communications with ATC may be authorized to operate in the runway safety area (RSA) up to the edge of the runway surface, which includes when aircraft are arriving, departing, or taxiing along the runway.
  2. Ensure that the runway to be used is free of all known ground vehicles, equipment, and personnel before a departing aircraft starts takeoff or a landing aircraft crosses the runway threshold.