5-4-7
Point Out
JO 7110.65BB, Change 3, effective July 9, 2026 · Official text on faa.gov
- The transferring controller must:
- Obtain approval before permitting an aircraft to enter the receiving controller's delegated airspace.
- EN ROUTE: Automated approval may be utilized in lieu of verbal approval. If the receiving controller takes no action, revert to verbal procedures.
- TERMINAL: Automated point out approval may be utilized in lieu of verbal provided the procedures are contained in a facility directive/LOA.
- Obtain the receiving controller's approval before making any changes to an aircraft's flight path, altitude, speed, or data block information after the point out has been approved.
- Comply with restrictions issued by the receiving controller unless otherwise coordinated.
- Be responsible for subsequent radar handoffs and communications transfer, including flight data revisions and coordination, unless otherwise agreed to by the receiving controller or as specified in a LOA.
- Obtain approval before permitting an aircraft to enter the receiving controller's delegated airspace.
- The receiving controller must:
- Ensure that the target position corresponds with the position given by the transferring controller or that there is an association between a computer data block and the target being transferred prior to approving a point out.
- Be responsible for separation between point out aircraft and other aircraft for which he/she has separation responsibility.
- Issue restrictions necessary to provide separation from other aircraft within his/her area of jurisdiction.