  1. When issuing a clearance for takeoff, first state the runway number followed by the takeoff clearance.
  2. When clearing an aircraft for takeoff from an intersection, state the runway intersection.
  3. When two or more aircraft call the tower ready for departure, one or more at the full length of a runway and one or more at an intersection, state the location of the aircraft at the full length of the runway when clearing that aircraft for takeoff.
  4. The controller must ensure that all runways along the taxi route that lead to the departure runway are crossed before the takeoff clearance is issued, except as stated in paragraph 3-9-10e.
    Runway/Taxiway Proximity
    FIG 3-9-21 Runway/Taxiway Proximity
  5. At those airports where the airport configuration does not allow for an aircraft to completely cross one runway and hold short of the departure runway and/or where airports do not have runway hold markings between runways, state the runway to be crossed with the takeoff clearance if the aircraft is not able to complete a runway crossing before reaching its departure runway.
    Runway/Taxiway Proximity
    FIG 3-9-22 Runway/Taxiway Proximity
  6. Do not use the term “full length” when the runway length available for departure has been temporarily shortened. On permanently shortened runways, do not use the term “full length” until the Chart Supplement is updated to include the change(s).
  7. Whenever a runway length has been temporarily or permanently shortened, state the word “shortened” immediately following the runway number as part of the takeoff clearance. This information must be issued in conjunction with the takeoff clearance.
    1. The addition of “shortened” must be included in the takeoff clearance for the duration of the construction project when the runway is temporarily shortened.
    2. The addition of “shortened” must be included in the takeoff clearance until the Chart Supplement is updated to include the change(s) when the runway is permanently shortened.
  8. USAF. When an aircraft is cleared for takeoff, inform it of the closest traffic within 6 miles on final approach to the same runway. If the approaching aircraft is on a different frequency, inform it of the departing aircraft.
  9. USA/USN/USAF. Issue surface wind and takeoff clearance to aircraft.