ERR MOU/SOP

NATCA ERR MOU/SOP 25May2017

No permission to download
MOU and SOP updated May 25, 2017

Summary of Changes
General: Corrected and standardized “NCEPT” throughout document. Updated to align with 2016 CBA and Article 42 references throughout document

Section 12:
  • Added “Green” and “Red” definitions
  • Category 2: modified definition for clarity and to provide flexibility for future modification.
  • Changed definition of anticipated gains/losses of CPC’s to “established training cycle for the facility” to align with existing practice.
  • Updated dates and references for exceptions to the National Release Policy.
  • Updated to 180 days to align with 2016 CBA.
  • Deleted Transitional Provision as no longer relevant.
Added Q&A to more information link
Back
Top Bottom