Priority Placement Tool

Priority Placement Tool March 2025

No permission to download
This tool, the “Facility Priority Placement Tool” (FPPT) was developed to determine the highest priority facilities and where immediate placements are needed. The tool and the output, the Facility Placement Plan, takes current staffing and future predictions into account to determine a facility's needs based on their projected number of Certified Professional Controllers (CPC’s) in relation to their CPC Target Number. Updated monthly.

The SOP for the FPPT and facility placement list can be found at the additional information link.

Related resources
Training Success Rates
Facility Placement Plan
  • Like
Reactions: senray and Panpan
Author
pointSixtyFive
Downloads
4,590
Views
54,924
First release
Last update

Ratings

5.00 star(s) 2 ratings

Latest reviews

THANK YOU!
Very helpful!
Back
Top Bottom