- Messages
- 487
- Facility
- ZDV Denver Center
From what the controllers i know have told me they wait for a bid to open and apply then they usually will take the most qualified. However it does show some of the Towers having academy grads so check the terminal placement list and see if any high traffic towers are available.Can you elaborate on this? What's the wait/timeline like? I get that I'm gonna likely be at a say level 6-7 tower and CPC in 12-18 months, what kind of wait time do I have on getting into DIA? Are their additional qualifications I'd have to obtain before being considered? Is the wait long because everyone else is vying for those spots too? I guess I'm confused how you go from a level 6 to a 10+
Last edited: