JasW
Lurker
- Messages
- 2
5−8−5. DEPARTURES AND ARRIVALS ON
PARALLEL OR NONINTERSECTING
DIVERGING RUNWAYS
TERMINAL. Authorize simultaneous operations between an aircraft departing on a runway and an aircraft on final approach to another parallel or nonintersecting diverging runway if the departure course diverges immediately by at least 30 degrees
from the missed approach course until separation is applied and provided one of the following conditions are met:....
Here states: ' appraoch to another... runway.... depature course diverge.... by at least 30 degrees. ' so A/C ONE takes off from runway 28L with runway heading of 310 . A/C B is on final approach for 28R and the missed appraoch course for 28R is designed to right turn heading 360. The distance between two runways is more than 2500ft. Can I authorize simultaneous dep and arr under that scenario ?
PARALLEL OR NONINTERSECTING
DIVERGING RUNWAYS
TERMINAL. Authorize simultaneous operations between an aircraft departing on a runway and an aircraft on final approach to another parallel or nonintersecting diverging runway if the departure course diverges immediately by at least 30 degrees
from the missed approach course until separation is applied and provided one of the following conditions are met:....
Here states: ' appraoch to another... runway.... depature course diverge.... by at least 30 degrees. ' so A/C ONE takes off from runway 28L with runway heading of 310 . A/C B is on final approach for 28R and the missed appraoch course for 28R is designed to right turn heading 360. The distance between two runways is more than 2500ft. Can I authorize simultaneous dep and arr under that scenario ?