If that happened in tandem that would have been great. Unless PSC was not working lvl 6 traffic and it barely moved the needle for GEG to go to an 8.But at the same time 8 controllers are cut in pay as you said but 21 will get raises. (guessing on those numbers). But I’m against consolidating lol. Or more importantly against closing facilities.
MWH is also a rough place getting people in the door, if they gave GEG their radar as well, they would be better staffed since the radar would be gone, and GEG would hopefully start moving up