I've never had an appreciate for management's efforts to always blame Controllers for everything...they love to do that.
But, watching the FALCON playback, even though the HELO says they are maintaining visual, they never maneuvered away from the CRJ or the course the CRJ was going to fly. I believe the HELO saw the correct traffic but didn't have an understanding (good mental picture) of what it was doing or where/how it was going to go/fly.
I'm not sure what else was going on in the cab (workload), but the CA was going off for a long time prior to impact and no traffic was ever exchanged to the CRJ. When the HELO didn't move or change course away from the CRJ AND/OR its projected flight path, instead of wasting time just telling the HELO to pass behind, there should have been a traffic alert and a very strong positive control instruction...the Controller should have moved the HELO or even better just sent the CRJ around.
That's what makes the job tricky. You can't work traffic for what's happening now. You have to project and work the traffic for (sometimes) minutes into the future.
I'm not trying to blame the Controller, but in my opinion there's things on our end that could have been done differently.
But, watching the FALCON playback, even though the HELO says they are maintaining visual, they never maneuvered away from the CRJ or the course the CRJ was going to fly. I believe the HELO saw the correct traffic but didn't have an understanding (good mental picture) of what it was doing or where/how it was going to go/fly.
I'm not sure what else was going on in the cab (workload), but the CA was going off for a long time prior to impact and no traffic was ever exchanged to the CRJ. When the HELO didn't move or change course away from the CRJ AND/OR its projected flight path, instead of wasting time just telling the HELO to pass behind, there should have been a traffic alert and a very strong positive control instruction...the Controller should have moved the HELO or even better just sent the CRJ around.
That's what makes the job tricky. You can't work traffic for what's happening now. You have to project and work the traffic for (sometimes) minutes into the future.
I'm not trying to blame the Controller, but in my opinion there's things on our end that could have been done differently.