Ouch, P80 and MGM.More downgrades
SPI 5 > 4
PSC 6 > 5
PIA 5 > 4
P80 9 > 8
MGM 7 > 6
Effective 10/22/2023
More stealth pay cutsMore downgrades
SPI 5 > 4
PSC 6 > 5
PIA 5 > 4
P80 9 > 8
MGM 7 > 6
Effective 10/22/2023
aap.faa.gov give you the facility TCI. ATADS does not.ATADS if you’re not at work
Ouch, P80 and MGM.
Upgrades are pretty predictable. Some of yall just can't read the contractThey got time for downgrades but facilities been above the buffer for almost 6 months and no upgrade yet?
Do you know if your facility did an adequate job explaining that to the national validation team?MGM got downgraded because our main runway was shortened to 6000 feet for about 9 months last year to replace the BAK 12s and we couldn't do any precision approaches so the military went somewhere else. Even now that the runway is back to normal the military traffic still hasn't fully returned. Then this year in March our F16s left while they wait to get their F35s in December. So no guard traffic either.
We hope to get back up to level 7 once the F35s return. We're barely below the threshold
I was told the union and the ATM provided a ton of documentation on the runway closure and ANG leaving that showed that both coincided with the traffic going down below level 7 minimums. Once the runway fully reopened traffic began coming back up until the ANG left where it started going back down again, but they still downgraded usDo you know if your facility did an adequate job explaining that to the national validation team?
There's a whole section about minimizing unwarranted facility pay level fluctuations.
Beneath that, a section about lowering facility pay levels and steps that your facility can take to delay it from happening.
These sections seem like they would have applied to your situation.
Well, if you upgrade again soon, everyone gets a 6 percent raise right?I was told the union and the ATM provided a ton of documentation on the runway closure and ANG leaving that showed that both coincided with the traffic going down below level 7 minimums. Once the runway fully reopened traffic began coming back up until the ANG left where it started going back down again, but they still downgraded us
Need to wait 2 years to get the free moneyWell, if you upgrade again soon, everyone gets a 6 percent raise right?
Oof.Need to wait 2 years to get the free money
To clarify: a downgrade needs to be in place for 2 years before a reupgrade will award a 6% raiseOof.
Ah yes but they held off on upgrading AZO because of proposed covid numbers despite being above the break point for 5 months. Even though any halfwit could tell they would stay well above those numbers after things picked back up.Not until traffic numbers are reflected. The FAA will not upgrade on purposed traffic they upgrade/downgrade based on current traffic levels.
No one gets an upgrade after just 5 months. Plus you get back pay anyways.Ah yes but they held off on upgrading AZO because of proposed covid numbers despite being above the break point for 5 months. Even though any halfwit could tell they would stay well above those numbers after things picked back up.
The process begins after 3 months in the green. But you also have to wait for the agency and NATCA to meetNo one gets an upgrade after just 5 months. Plus you get back pay anyways.
NATCA talks about facilities upgrading and downgrading highly and like to act like increasing our pay is guaranteed because of our contract AKA as if it were contractual. It is contractual... but the agency is going to do everything it can, to not upgrade facilities. Congress give X to the FAA for funding so how can the FAA spend 2X on facility upgrades? (it cant) Why do you think these new models are being made to readjust facility levels? Aviation is still a growing industry and they need to spend equal to or less money so a bunch of numbers are going to be pushed around and the end result is the FAA spending the same amount of money.Ah yes but they held off on upgrading AZO because of proposed covid numbers despite being above the break point for 5 months. Even though any halfwit could tell they would stay well above those numbers after things picked back up.
More downgrades
SPI 5 > 4
PSC 6 > 5
PIA 5 > 4
P80 9 > 8
MGM 7 > 6
Effective 10/22/2023
3 of these downgrades are 804's and given golden tickets to any facility in the NAS. Get a clue Top5dipshit