Uglytaco
Forum Sage
- Messages
- 488
So Cat one basically means “we need mfs right away”They're release categories. Cat 1 being within 6 months, Cat 2 being within 12 months. The majority of facilities actually fall into Cat 3 despite whatever they say, meaning whoever works there is condemned to purgatory for the sheer disgusting crime of existing within their mortal frame and being a general waste of oxygen and stardust...at least that's what the last FAA memo said.