Priority placement tool questions

Super Salt

???
Staff member
I ♥ pointSixtyFive
Messages
996
Question relating to "Projected Losses": Is it in reference to losses in a given time frame? Such as, the expected loss of CPC's in the given year or in years down the line?
 
Question relating to "Projected Losses": Is it in reference to losses in a given time frame? Such as, the expected loss of CPC's in the given year or in years down the line?
For the training cycle. All of the projection numbers are relative to the training time (1, 2,or 3 yrs).
 
What does the second to last column on the PPT actually mean? I feel kinda dumb trying to understand one or two things on there. If my facility says -3.5 for projected cpc in regard to the national avg, does that mean we are projected to be 3.5 controllers over the national average? What is all the colors people have been talking about also?
 
What does the second to last column on the PPT actually mean? I feel kinda dumb trying to understand one or two things on there. If my facility says -3.5 for projected cpc in regard to the national avg, does that mean we are projected to be 3.5 controllers over the national average? What is all the colors people have been talking about also?
yes. red is < 5% below avg, yellow >5% above avg, green is between the two.
 
Back
Top Bottom