- Apply NCEPT SOP paragraph 3.5.5 as follows: Consideration of ERR requests will generally occur up to a projected CPC to target of at or below 85%. ERR requests above 85% of projected CPC to target will be considered on a case-by-case basis. Requests to transfer to a Facility Pay Level (FPL) 9 and below facilities up to 100% of the projected CPC to target percentage will only be considered for extenuating circumstances after all other ERR requests have been reviewed. The NCEPT panel may expand consideration up to 100% to include additional FPL facilities. A facility will normally not be considered to receive employees if the ration of CPC-IT/DEV to total number of controllers is at or above 30%.
there it is. Its not Trainee/cpc ratio, its trainee to controllers. That means total bodies, not just certified bodies. if a facility has 10 trainees and 30 cpcs, the ratio isn't 33.3 percent, its 25 percent.
Bos shows 5 on the facility status and priority, but 8 on the PPT. 8 gets them to target, 5 gets them to a cpc/controller ratio below 30 percent.
there it is. Its not Trainee/cpc ratio, its trainee to controllers. That means total bodies, not just certified bodies. if a facility has 10 trainees and 30 cpcs, the ratio isn't 33.3 percent, its 25 percent.
Bos shows 5 on the facility status and priority, but 8 on the PPT. 8 gets them to target, 5 gets them to a cpc/controller ratio below 30 percent.