February 2019

Messages
17
Likes
11
Facility
PCT Potomac Tracon
#22
If I had an ERR in for a facility, then received and accepted a TOL for a TMU position, will my ERRs be removed from the system or do I still need to call HR and remove them?
I just don’t want to block anyone at my facility.
 
Messages
9
Likes
1
#23
They adjusted the CPC target numbers for a bunch of facilities between those two that's why it was such a big shakeup
It changes every month. The change at the end of a calendar year has been drastic in the past because they reset the projected retirement and other losses column.
So but now currently we should not expect any drastic changes to the facility priority rankings and there possible gains? I mean we are not expecting a reset of the projected retirement and other losses column or an adjustment of CPC targets this time around
 
Messages
10
Likes
14
#24
If I had an ERR in for a facility, then received and accepted a TOL for a TMU position, will my ERRs be removed from the system or do I still need to call HR and remove them?
I just don’t want to block anyone at my facility.
I think you need to email/call. It may drop out eventually but it's not instantaneous. I knew a guy in a similar situation who got picked up on an ERR after already accepting a TOL.
 
Messages
498
Likes
339
#25
So but now currently we should not expect any drastic changes to the facility priority rankings and there possible gains? I mean we are not expecting a reset of the projected retirement and other losses column or an adjustment of CPC targets this time around
I'd imagine at the beginning of the year everything is updated. A new year if training statistics is added. Retirements are also probably updated.
 

Maintainvfr

Trusted Contributor
Messages
188
Likes
197
#26
So but now currently we should not expect any drastic changes to the facility priority rankings and there possible gains? I mean we are not expecting a reset of the projected retirement and other losses column or an adjustment of CPC targets this time around
Since this will be the first round of 2019 the projected column will be reset vs the last round, so there is potential for a big change
 
Messages
686
Likes
378
#27
So but now currently we should not expect any drastic changes to the facility priority rankings and there possible gains? I mean we are not expecting a reset of the projected retirement and other losses column or an adjustment of CPC targets this time around
I would expect a drastic change for some facilities from the Jan PPT (timestamped late Dec) to the Feb PPT (timestamped late Jan 2019). Look back to how the numbers changed at the end of last year. All the PPTs are tabbed.
 
Messages
9
Likes
1
#29
Since this will be the first round of 2019 the projected column will be reset vs the last round, so there is potential for a big change
I would expect a drastic change for some facilities from the Jan PPT (timestamped late Dec) to the Feb PPT (timestamped late Jan 2019). Look back to how the numbers changed at the end of last year. All the PPTs are tabbed.
There are some facilities on the current facility ranking list with 0 possible gains but I am hoping by the final list for February those facilities have possible gains at least 1 or more. That would change what I put in for.
 
Messages
9
Likes
1
#31
Why not put in for them anyways?
I will put in for them anyway because they are below 100% but above the national average. My hope though is they fall below the national average because of the first pass second pass in the NCEPT. Otherwise I may have to put in for facilties that are below the national average also. Ideally the facility I want the most is the one thats above the national average right now though
 
Last edited:
Messages
686
Likes
378
#32
I will put in for them anyway because they are below 100% but above the national average. My hope though is they fall below the national average because of the first pass second pass in the NCEPT. Otherwise I may have to put in for facilties that are below the national average also. Ideally the facility I want the most is the one thats above the national average right now though
If they reset the proj retirements column in January you can consider the current data irrelevant
 
Top