Robert_Boucher
Forum Sage
- Messages
- 851
I believe soThe current Facility Priority List is the one they’ll go by right?
I believe soThe current Facility Priority List is the one they’ll go by right?
What do you want to know? I can check it right nowCan someone upload the new PPT and facility rankings on here?
Projected for SFB, CLT, and DABWhat do you want to know? I can check it right now
My question as well. Cause it doesn’t look like anything changed...???The current Facility Priority List is the one they’ll go by right?
A80/AGS/BOS/BWI/C90/CMI/CVG/D21/DCA/DEN/ELM/EWR/GCN/HCF/JFK/L30/LGA/M98/MIA/MWH/N90/NCT/ORD/ORF/PHL/S56/SAV/SCT/SFO/SNA/ZNYSo what are the list of facilities that can pick people up? Is it still the same 19
A80/AGS/BOS/BWI/C90/CMI/CVG/D21/DCA/DEN/ELM/EWR/GCN/HCF/JFK/L30/LGA/M98/MIA/MWH/N90/NCT/ORD/ORF/PHL/S56/SAV/SCT/SFO/SNA/ZNY
These all have Current and Projected at 85% or below, I didn't bother doing the math on the 30% training ratio thing
Shows:I’m a little confused. S46 on facility status and priority says it can pick up 2 people. Is that not correct?
Shows:
Current 88.4%
Projected 86.7%
So supposedly no other facilities will be picking anyone up on this next panel?A80/AGS/BOS/BWI/C90/CMI/CVG/D21/DCA/DEN/ELM/EWR/GCN/HCF/JFK/L30/LGA/M98/MIA/MWH/N90/NCT/ORD/ORF/PHL/S56/SAV/SCT/SFO/SNA/ZNY
These all have Current and Projected at 85% or below, I didn't bother doing the math on the 30% training ratio thing
alphawhiskey and BlakehansoSo that’s a no? I dont understand this thing. Lol.
For inbounds:So that’s a no? I dont understand this thing. Lol.
Okay roger.For inbounds:
Projected below 85% means guaranteed selections. 85-natl avg is case by case. Any selections above 30% CPC/trainee ratio is case by case.
August ranking list currently posted on ksn is not the draft order they will use. Sept should post by friday
Well shoot looks like SFO made the list and falls under those perimeters as well. Things have really changed.alphawhiskey and Blakehanso
My understanding is for a typical pickup, the facility needs to be 85% or below on both Current and Projected. Also cant have a Trainee:CPC ratio above 30%. Doesn't mean movements outside those lines will not occur though
Yeah September is upFor inbounds:
Projected below 85% means guaranteed selections. 85-natl avg is case by case. Any selections above 30% CPC/trainee ratio is case by case.
August ranking list currently posted on ksn is not the draft order they will use. Sept should post by friday
Yeah September is up
It looks like the same one as on the work computersIs the facility ranking list the same one that is on here? Or that one was August?
It looks like the same one as on the work computers
Ha, ranking list is updated now. Definitely changed up the algorithm. Still somewhat confusing based on the whole staffing up to at or below 85%.Interesting. You'd think they would update it cause some of the pickup numbers are vastly different on the latest PPT. Like DCA only shows 2 possible gains on the PPT, but 3 on the priority list or BOS shows 5 on PPT, but 4 on priority list but who knows 😵