November (Q1) 2023

Rules and Modifications to the board:
Round 1

· Releasing facility must be at or above 85% current % CPC to Target (column L of the PPT) and at or above 85% Projected % to Target (column AA of the PPT).
· Releases stop when the facility drops below 85% Current or 85% Projected % to Target.
· Gaining facility must be below the Projected National Average (top of column AA of the PPT)*
· The order of gaining facilities will be based on the most recent decision lens agreement**

Round 2

· Releasing Facility must be ATC Level 4 through Level 7
· Releasing facility must be at or above 85% current % CPC to Target (column L of the PPT) and at or above 85% Projected % to Target (column AA of the PPT)
· Releases stop when the facility drops below 85% Current or 85% Projected % to Target.
· Gaining facility must be ATC Level 8 through Level 12
· Gaining facility must be below 90% Projected % to Target
· Selections stop when gaining facility reaches at or above 90% Projected % to Target
· The order of gaining facilities will be based on the most recent decision lens agreement**
Category Release Dates:
Category 1 Three month release date
· February 12, 2023 (PP5)
Category 2 One Year Release Date
· November 19, 2023 (PP25)
MJ motion to update the OP with rules
 
So FAA...
wahwah.png

Air Traffic Control Vacation GIF by dfs_campuswelt
 
Yea the ranking numbers don’t make too much sense. Plenty of places high priority that can’t pick up in round 1 (which would suggest they don’t need people THAT bad compared to other facilities)
 
It looks like about ~45 facilities can pick up in the first round, and ~85 in the second round. Should be interesting.

And I think that’s why N90 is ranked 400.
Doesn't someone usually make a list of who can release/pickup here...
 
Does the NCEPT priority even mean anything if the facility says 0 gains? Wonder why it's placed in that order if facilities say they can't gain
 
Back
Top Bottom